Building Owner Chinese YMCA of Hong Kong
Replacement of more efficient chiller
Conversion to variable speed chilled water pump
Replacement of traditional 3-speed FCU to variable speed FCU with permanent magnet motor
Using electronically commutated (EC) plug fan in AHU / PAU / CRAC
Provision of Smart Metering
Using AI solution and data mining technologies to optimise energy efficiency and operational performance for major equipment and building services systems
Building/Project Name Chinese YMCA of Hong Kong, Kowloon Centre
Systems HVAC - Waterside Air Conditioning System
HVAC - Airside Air Conditioning System
Electrical System - Electricity Distribution System
Smart control Platform
Building Types Commercial - Hotel & Hostel/Apartment
Others - Recreational
Description of the building:
3 Block building, consisting of 15 floors of hotel, and 9 floors of mixed public recreational facilities, activity rooms and office.

Fully air-conditioned, with air-cooled central chilled water system and split-type air-conditioning units.

Traction motor lift.
 


Retrofitted initiative:

HVAC – Waterside air conditioning system
  • Replacement of more efficient chiller: Renew of aged chiller units to more efficient chiller units with variable speed drives.
  • Conversion to variable speed chilled water pump
  • Conversion of chilled water system to variable flow system, with necessary sensors and controllers to adjust flowrate of chilled water in accordance to chiller unit load.

HVAC – Airside air conditioning system
  • Replacement of FCU with DC motor: Retrofitted traditional AC motors in FCU with DC motor drives, which is connected to BMS system for central control.
  • Using EC plus fan in AHU/ PAU
  • Retrofitted EC plug fans to existing AHU/ PAU, and conversion to demand control fresh ait system by carbon dioxide sensor and modulating damper.

Electrical system:
  • Provision of Smart Metering
  • Energy consumptions of the systems, including Lift escalator, lighting, pumps are logged for analyzing consumptions, trends and Retro-Commissioning projects in future.

Smart Control Platform:
  • BMS system with AI solution and data mining technology
  • HVAC system including Chiller units, chilled water pumps, PAU/AHU, FCU; and lighting systems, is connected to BMS system.
  • Chiller plant data is analyzed by AI technology to optimize running parameters and scheduling for energy savings.


Observed benefits other than energy saving:

  • Quieter operation of upgraded chiller units, PAU and FCU.
  • Reduced maintenance resources in plant operation and future Retro-Commissioning and balancing.
  • Reduced maintenance resources in plant operation and future retro-commissioning and balancing.
  • Overall systems monitoring for planning of running schedules, fault monitoring, and preventive maintenance planning.


General observations of the retrofitting project:

Retrofitting initiatives with proven technology, and straightforward.


Other information:

Cost Saving
Total cost: HKD 33.5 million Total savings/year: HKD 2,850,000
Cost breakdown: (1)Replace chiller units and chilled water pumps: HKD 8.5 million

(2)Retrofit DC motor and EC plug fans: HKD 19.5 million

(3)Modification of Smart Control Platform + Electrical system: HKD 5.5 million
Savings/year breakdown: (1)Chiller units and chilled water pumps replacement:
920,000 kWh (Chiller units and chilled water pumps replacement)

(2)Retrofit DC motor and EC plug fans
480,000 kWh

(3)Modification of Smart Control Platform + Electrical system:
500,000 kWh

(1)+(2):HKD 2,100,000; (3): HKD 750,000
Payback: 11.75 years

For (1) & (2): 13 years
For (3): 7.3 years
Name of consultant and contractors: Subsidy/ Funding
Consultant: ISPL Consulting Limited The project is supported by: HKJC


Replacement of more efficient chiller
Conversion to variable speed chilled water pump
Replacement of traditional 3-speed FCU to variable speed FCU with permanent magnet motor
Using electronically commutated (EC) plug fan in AHU / PAU / CRAC
Provision of Smart Metering
Using AI solution and data mining technologies to optimise energy efficiency and operational performance for major equipment and building services systems
Building Owner Chinese YMCA of Hong Kong
Building/Project Name Chinese YMCA of Hong Kong, Kowloon Centre
Systems HVAC - Waterside Air Conditioning System
HVAC - Airside Air Conditioning System
Electrical System - Electricity Distribution System
Smart control Platform
Building Types Commercial - Hotel & Hostel/Apartment
Others - Recreational
Description of the building:

3 Block building, consisting of 15 floors of hotel, and 9 floors of mixed public recreational facilities, activity rooms and office.

Fully air-conditioned, with air-cooled central chilled water system and split-type air-conditioning units.

Traction motor lift.
 
Retrofitted initiative:

HVAC – Waterside air conditioning system
  • Replacement of more efficient chiller: Renew of aged chiller units to more efficient chiller units with variable speed drives.
  • Conversion to variable speed chilled water pump
  • Conversion of chilled water system to variable flow system, with necessary sensors and controllers to adjust flowrate of chilled water in accordance to chiller unit load.

HVAC – Airside air conditioning system
  • Replacement of FCU with DC motor: Retrofitted traditional AC motors in FCU with DC motor drives, which is connected to BMS system for central control.
  • Using EC plus fan in AHU/ PAU
  • Retrofitted EC plug fans to existing AHU/ PAU, and conversion to demand control fresh ait system by carbon dioxide sensor and modulating damper.

Electrical system:
  • Provision of Smart Metering
  • Energy consumptions of the systems, including Lift escalator, lighting, pumps are logged for analyzing consumptions, trends and Retro-Commissioning projects in future.

Smart Control Platform:
  • BMS system with AI solution and data mining technology
  • HVAC system including Chiller units, chilled water pumps, PAU/AHU, FCU; and lighting systems, is connected to BMS system.
  • Chiller plant data is analyzed by AI technology to optimize running parameters and scheduling for energy savings.

Observed benefits other than energy saving:

  • Quieter operation of upgraded chiller units, PAU and FCU.
  • Reduced maintenance resources in plant operation and future Retro-Commissioning and balancing.
  • Reduced maintenance resources in plant operation and future retro-commissioning and balancing.
  • Overall systems monitoring for planning of running schedules, fault monitoring, and preventive maintenance planning.

General observations of the retrofitting project:

Retrofitting initiatives with proven technology, and straightforward.

Other information:

Cost Saving
Total cost: HKD 33.5 million Total savings/year: HKD 2,850,000
Cost breakdown: (1)Replace chiller units and chilled water pumps: HKD 8.5 million

(2)Retrofit DC motor and EC plug fans: HKD 19.5 million

(3)Modification of Smart Control Platform + Electrical system: HKD 5.5 million
Savings/year breakdown: (1)Chiller units and chilled water pumps replacement:
920,000 kWh (Chiller units and chilled water pumps replacement)

(2)Retrofit DC motor and EC plug fans
480,000 kWh

(3)Modification of Smart Control Platform + Electrical system:
500,000 kWh

(1)+(2):HKD 2,100,000; (3): HKD 750,000
Payback: 11.75 years

For (1) & (2): 13 years
For (3): 7.3 years
Name of consultant and contractors: Subsidy/ Funding
Consultant: ISPL Consulting Limited The project is supported by: HKJC


Replacement of more efficient chiller
Conversion to variable speed chilled water pump
Replacement of traditional 3-speed FCU to variable speed FCU with permanent magnet motor
Using electronically commutated (EC) plug fan in AHU / PAU / CRAC
Provision of Smart Metering
Using AI solution and data mining technologies to optimise energy efficiency and operational performance for major equipment and building services systems

   